• TO DO
    • Drink
    • Eat
    • Hike
    • History
    • Play
    • Vortex
    • Sedona Real Estate
    • Relax
    • Shop
    • Stay
  • GIFT SHOP
  • Real Estate
  • EVENTS
  • About Us
  • The Sedonan
  • Blog
  • Sedona.Biz
  • TO DO
    • Drink
    • Eat
    • Hike
    • History
    • Play
    • Vortex
    • Sedona Real Estate
    • Relax
    • Shop
    • Stay
  • GIFT SHOP
  • Real Estate
  • EVENTS
  • About Us
  • The Sedonan
  • Blog
  • Sedona.Biz
Advertise
Blog

City continues night work on phase two of the SR 179 Sewer Main Replacement Project

Share
Facebook Twitter LinkedIn Pinterest Email

2279f 903a9c e65f07ddaf634a93b1976b2f12dc48a4mv2

As the State Route (SR) 179 Sewer Main Replacement Project: Phase 2 continues, the city of Sedona and their contractor, Standard Construction Company, will conduct night work and road closures over the next week as crews work to finish repairing additional sewer main that was discovered to be damaged as well as repair concrete that was damaged during sewer repair.

For the week of Feb. 28, 2022, the contractor will continue night work to perform operations that cannot be completed during the day without major traffic implications. Specifically, work will occur on the nights of Sunday, Feb. 27, 2022, to Thursday, March 3, 2022. Traffic control set-up will begin at 8 p.m., with lane closures and a pilot car operation lasting from 10 p.m. to 7 a.m. It is possible there will also be day work continuing throughout this time period.

Night work will minimize impacts to local businesses and the traveling public and allow crews to repair damaged sewer main and concrete along SR 179, just west of the Schnebly Hill roundabout. A pilot car operation will be in place during night work to keep traffic moving, despite full lane closures. Please allow extra time to get through the area and follow all marked signage.

Temporary sidewalk and driveway closures will be necessary during the upcoming work. The contractor will coordinate with local businesses to ensure access is provided when possible.

The city will continue to send night work closure updates on a weekly basis or as dates are known. To receive eNews project updates, find additional project information or reach a project team member, email news@sr179sewermainreplacement.com, call the Project Hotline at (928) 852-4164, or visit www.sr179sewermainreplacement.com.

Healing Paws

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Things to do in Sedona For Families

31st SEDONA INTERNATIONAL FILM FESTIVAL

Pet Friendly Restaurants in Sedona

Healing_Paws
Categories
  • Accommodations
  • Adventure
  • American
  • Asian
  • Attractions
  • Bakery / Cofee House / Cafe
  • Blog
  • Breweries
  • Careers
  • Discover
  • Events
  • Explore
  • Fine Dining
  • French
  • French Bistro
  • Insider
  • Italian
  • Mediterranean
  • Metaphysics
  • metaphysics
  • Mexican
  • Real Estate
  • Relax
  • Restaurants
  • Sedona News
  • Southwestern
  • Steakhouse
  • Wine Country
loader-image
Sedona Arizona
Sedona, US
3:02 pm, May 22, 2025
92°F
clear sky
8 %
1010 mb
14 mph
Wind Gust: 22 mph
Visibility: 10 km
Sunrise: 5:19 am
Sunset: 7:28 pm
Weather from OpenWeatherMap

Get Informed with
The Sedonan

If you want to know more about Sedona, sign up for our free newsletter full of tips and great travel ideas.

 

Select list(s) to subscribe to


Sedona’s Best Visitor’s Guide®

Useful Resources

Visit our Store
Sedona Biz
Weather
Coupons
History
Real Estate
Psychic Readings
Vortex
About Us
Goodies and Freebies
Contact
The Sedonan
Facebook Twitter Youtube Instagram

Sedona, Arizona | Sedona's Best Visitor's Guide® | Copyright 1988 - 2025 | All rights reserved.

Privacy Policy

X