• HOME
  • BLOG
  • TO DO
    • EAT
    • HIKE
    • PLAY
    • RELAX
    • SHOP
    • STAY
    • WINE & BEER
  • GIFT SHOP
  • CONTACT
  • ABOUT US
  • ADVERTISE
Facebook YouTube
Sedona’s Best Visitors GuideSedona’s Best Visitors Guide
  • HOME
  • The Sedonan
  • TO DO
    • DRINK
    • EAT
    • HIKE
    • PLAY
    • PSYCHIC READINGS
    • REAL ESTATE
    • RELAX
    • SHOP
    • STAY
  • ABOUT SEDONA
  • GIFT SHOP
  • EVENTS
  • CONTACT
Advertise
Facebook YouTube
Sedona’s Best Visitors GuideSedona’s Best Visitors Guide
Blog

Forest Road Connection Project to begin

April 22, 2022
Share
Facebook Twitter LinkedIn Pinterest Email

Healing Paws

As part of the Sedona in Motion (SIM) program, the city of Sedona and their contractor, Fann Contracting, Inc., will begin construction of the Forest Road Connection Project the week of April 25, 2022.

The project includes the construction of a new two-lane roadway that will connect the current terminus of Forest Road to a new intersection on State Route 89A, just west of the “Y” roundabouts. Additional work includes the installation of new concrete curb and gutter, retaining walls, a shared-use path, drainage infrastructure, landscape improvements and the extension of sewer infrastructure. Once complete, this project will allow motorists to bypass two busy roundabouts (while reducing traffic in those roundabouts), provide additional access for emergency responders, add an auxiliary evacuation route, and create a new, off-highway, walk and bike connection between Uptown and West Sedona. The project is scheduled to be finished in summer 2023.

Starting Monday, April 25, 2022, crews will be mobilizing equipment into the area to identify landscape removal extents ahead of roadwork commencing. Work may occur Monday through Friday, from 7 a.m. to 5:30 p.m. While the majority of this project will not impact traffic, please be aware of loud noise, potential lane closures, reduced speeds, rough road conditions and flagging operations while crews are connecting the new roadway to SR89A.

To receive regular project updates, obtain additional project information or reach a project team member, email news@forestroadconnection.com or call the Project Hotline at (928) 852-4164.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Cinco de Mayo in Sedona

May 4, 2023

Seven Lucky Sedona Restaurants with Great Views and Ambiance

April 29, 2023

Esteban Graces Sound Bites Grill This Weekend

March 20, 2023
Healing_Paws
Categories
  • Accommodations
  • Adventure
  • American
  • Asian
  • Attractions
  • Bakery / Cofee House / Cafe
  • Blog
  • Breweries
  • Events
  • French Bistro
  • Insider
  • Italian
  • Mediterranean
  • Mexican
  • Relax
  • Restaurants
  • Sedona News
  • Southwestern
  • Steakhouse
Sedona Arizona
Sedona, US
12:54 am, May 28, 2023
60°F
clear sky
Wind: 10 mph
Pressure: 1015 mb
Visibility: 10 km
Sunrise: 5:16 am
Sunset: 7:32 pm
Weather from OpenWeatherMap

Get Informed with
Sedona Newsletter

If you want to know more about Sedona, sign up for our free newsletter full of tips and great travel ideas.

 

Select list(s) to subscribe to


Sedona’s Best Visitor’s Guide®

Useful Resources

Visit our Store
Sedona Biz
Weather
Events
History
Real Estate
Psychic Readings
Vortex
About Us
Facebook Twitter Youtube Instagram

Sedona, Arizona | Sedona's Best Visitor's Guide® | Copyright 1988 - 2023 | All rights reserved.

X